HyracHub
← Browse
Setting Out and Strip Foundations

Setting Out and Strip Foundations

Updated 10/20/2026

EN631.0 KB

Free

▶ Start learning

Play it right here in your browser — no install needed.

Sign in to save your progress across devices
Get the appOffline learning lives in the app.

Also available in

What you'll learn

  • Set up profile boards and string lines correctly for a building outline
  • Apply the 3-4-5 method to verify corners are exactly 90 degrees
  • Transfer levels using a water level (hose pipe)
  • Excavate trenches to the correct depth and width from the drawing
  • Place blinding concrete, strip footing concrete, and build substructure walling to DPC level
  • Identify site safety requirements including trench safety and PPE

About

Learn to set out building lines, use profile boards and string lines, check square with the 3-4-5 method, and construct strip foundations to DPC level.

What's inside· 11 lessons
  1. 1About This Pack
  2. 2Reading the Site Plan
  3. 3Setting Up Profile Boards
  4. 4The 3-4-5 Method
  5. 5On Site: Profile Boards and String Lines
  6. 6Transferring Levels with a Water Level
  7. 7Excavating Trenches Safely
  8. 8Blinding and Strip Footing Concrete
  9. 9Substructure Walling, DPC and Hardcore
  10. 10Site Terms
  11. 11Practice: The 3-4-5 Method

Part of these paths

Reviews

No reviews yet.

Questions & discussion

Sign in to ask a question or reply

No questions yet.