Setting Out and Strip Foundations

Setting Out and Strip Foundations

Imesasishwa 20/10/2026

EN631.0 KB

Bila malipo

▶ Anza kujifunza

Icheze hapa hapa kwenye kivinjari chako — hakuna usakinishaji.

Ingia ili kuhifadhi maendeleo yako kwenye vifaa vyote
Pata programuKujifunza nje ya mtandao kupo kwenye programu.

Inapatikana pia kwa

Utakachojifunza

  • Set up profile boards and string lines correctly for a building outline
  • Apply the 3-4-5 method to verify corners are exactly 90 degrees
  • Transfer levels using a water level (hose pipe)
  • Excavate trenches to the correct depth and width from the drawing
  • Place blinding concrete, strip footing concrete, and build substructure walling to DPC level
  • Identify site safety requirements including trench safety and PPE

Kuhusu

Learn to set out building lines, use profile boards and string lines, check square with the 3-4-5 method, and construct strip foundations to DPC level.

Kilichomo ndani· masomo 11
  1. 1About This Pack
  2. 2Reading the Site Plan
  3. 3Setting Up Profile Boards
  4. 4The 3-4-5 Method
  5. 5On Site: Profile Boards and String Lines
  6. 6Transferring Levels with a Water Level
  7. 7Excavating Trenches Safely
  8. 8Blinding and Strip Footing Concrete
  9. 9Substructure Walling, DPC and Hardcore
  10. 10Site Terms
  11. 11Practice: The 3-4-5 Method