Setting Out and Strip Foundations
Imesasishwa 26/9/2026
EN631.3 KB
Bila malipo
▶ Anza kujifunza
Icheze hapa hapa kwenye kivinjari chako — hakuna usakinishaji.
Ingia ili kuhifadhi maendeleo yako kwenye vifaa vyotePata programuKujifunza nje ya mtandao kupo kwenye programu.
Inapatikana pia kwa
Utakachojifunza
- Set up profile boards and string lines correctly for a building outline
- Apply the 3-4-5 method to verify corners are exactly 90 degrees
- Transfer levels using a water level (hose pipe)
- Excavate trenches to the correct depth and width from the drawing
- Place blinding concrete, strip footing concrete, and build substructure walling to DPC level
- Identify site safety requirements including trench safety and PPE
Kuhusu
Learn to set out building lines, use profile boards and string lines, check square with the 3-4-5 method, and construct strip foundations to DPC level.
Kilichomo ndani· masomo 13
- 1The 3-4-5 Method
- 2Substructure Walling, DPC and Hardcore
- 3End Test
- 4Site Terms
- 5Setting Out Exercise
- 6Reading the Site Plan
- 7About This Pack
- 8Practice: The 3-4-5 Method
- 9Blinding and Strip Footing Concrete
- 10Transferring Levels with a Water Level
- 11Setting Up Profile Boards
- 12On Site: Profile Boards and String Lines
- 13Excavating Trenches Safely